P16-EV120-P18 returning from an infrastructure evaluation run to Sandringham approach Brighton Beach.
P19 shunts Freight Australia container loading in North Dynon Yard.
P17-EV120-P14 on an infrastructure evaluation run pass through Newmarket.
P17-EV120-P14 returning from an infrastructure evaluation run to Sandringham at Elsternwick.
P16 hauling a single grain hopper from Newport to Tottenham Yard.
P14-EV120-P17 on an infrastructure evaluation run to northern Victoria cross the Maribyrnong River bridge at Footscray.
P16-P14-T395-T364 hauling two spoil wagons to Tottenham Yard at Newport.
P16-EV120-P14 on an infrastructure evaluation run at North Melbourne.
P16-EV120-P14 returning from an infrastructure evaluation run to Frankston at Chelsea.
Three N class locos arrive light from South Dynon as P12 looks on at Southern Cross.
P18-EV120-T364 returning from an infrastructure evaluation run to Sandringham cross the Yarra River bridge at South Yarra.
P16-T386 hauling H1-H2-H5-H3 from Tottenham Yard to Bendigo approach Sunshine.
P16-EV120-T381 returning from an infrastructure evaluation run to Carrum pass through Parkdale.
P16-T381 running light to Parwan Loop to assist an SSR grain train pass through Deer Park Station.
P16-EV120-T386 returning from an infrastructure evaluation run to Bairnsdale approach Flinders Street Station.